Prices of standard gold bullion bars as of 01.10.2026
Buyback, KGS
Sale, KGS
1 g.
12 962.00
13 646.00
2 g.
24 688.50
26 057.00
5 g.
60 063.00
63 118.50
10 g.
118 893.50
125 004.50
20 g.
237 022.50
249 609.50
31.1035 g.
367 720.50
387 287.50
50 g.
590 199.50
621 484.50
100 g.
1 177 853.50
1 240 789.50
250 g.
2 958 692.50
3 116 215.50
500 g.
5 906 800.50
6 221 481.00
1000 g.
11 819 317.00
12 448 678.00
Exchange rates of the NBKR as of 01.10.2026
30.09.2026
01.10.2026
USD
87,4483
87,4487
EUR
99,2363
99,3111
RUB
1,0365
1,0404
KZT
0,1990
0,1982
Precious metals at 01.10.26 UTC
USD/gr.
Gold
133,17
Silver
1,9320
Palladium
38,603
Platinum
54,626

«Karakala-Terek» deposit

Kyrgyzaltyn OJSC has License No. 7359 AE dated July 17, 2023 for the right to use subsoil for the purpose of developing the Terek field and License No. 7360 AR dated July 17, 2023 for the right to use subsoil for the purpose of geological exploration at the Karakala-Terek area field.

The size of the licensed area is 6700 hectares.

The field is located in the Alai district of Osh region, at the eastern end of the Alai ridge, on the right side of the Gulcha river, at altitudes of 2100-2600 m.

 

The area is well developed and easily accessible. The nearest settlements and power lines are 0.5-2 km away, the road is 0.5-2 km away, and the railway station is 125 km away. The field is adjacent to the Osh-Khorog state highway. A temporary road about 3 km long has been built to the central part of the deposit.

Two age differences of rocks (P3 and C2) are separated by the steeply dipping Karakalinsky crack of north-northeast strike. Along its eastern wing, a mineralized shear zone 14 km long and 300-700 m wide can be traced. This zone controls the placement of gold-sulfide-quartz mineralization.

Mineralization is localized in steeply dipping linear zones of carbonate-quartz veining, consistent with the general submeridional structural plan of the deposit. Within these zones, 21 ore bodies have been identified in the form of steeply dipping submeridional veins. The ore bodies have not been traced along the dip. The near-ore alteration is represented by a dense network of veinlets of quartz, ankerite and ankerite-quartz compositions.

In total, the predicted resources of category P2 for the deposit are 47.4 tons of gold, for category C1+C2 they are 3.3 tons of gold.

Other projects

Kyrgyz Republic, Bishkek, st. Abdymomunova, No. 195
Company